For fabricators
Know what every job really costs you.
Snap a photo of a supplier invoice. Your material costs update, every job is re-costed — waste and labor included — and you see which quotes just got less profitable.
Create your accountOne price move, worked through
ExampleA36 HR FB 1/4 X 2 20' · 3.4 CWT · $333.20
- A36 flat bar, per lb
- $0.82 → $0.98 (+19.5%)
- In one job of 10
- 34 lb + 8% waste, 90 min labor at $32.00/h, 30 min machine time at $60.00/h
- Cost of one
- $13.93 → $14.52
- Margin at $22.00
- 36.68% → 33.99%
- To keep the old margin
- charge $22.94
Example numbers, not market prices — the same arithmetic the app runs on your invoices.
Set up the way you work
- Materials, priced from your invoices, by kg, lb, ft, in, m, sheet, each.
- Jobs list what goes into each part, with labor time and machine time at its own hourly rate. Each material carries its own waste % (new ones start at 8%), and any line can override it.
- Quotes carry your selling price, so every margin stays current.
- Suggested categories: bar stock, sheet plate, tube pipe, fasteners, consumables, finishing coating, outsourced service.
- Bought-in work (category: outsourced service) starts at 0% waste and is listed apart from materials.
- Quote a job from materials, labor and machine time: a price per part and a job total at your target margin, with a printable cost sheet.
Not there yet
- No market-price feed for fabricators' supplies — the Market Watch prices are food commodities only.
- No connections to supplier portals or point-of-sale systems: invoices come in as photos or PDFs.